Showing posts with label Ventilation. Show all posts
Showing posts with label Ventilation. Show all posts

Thursday, January 10, 2013

"Secret" Project Revealed!

Not a huge secret, but I finally decided that I've had enough of stepping on that awful grate across the Office door's threshold, so I've decided to do the necessary work to finish the duct work.

As many of you might know, a few months ago I was in Ottawa, and I found an antiques salvage store that carried some heating grates identical to the one in my living room. As far as I can tell, the house only ever had ONE of these wall grates, which I find odd, and I thought it would be fun to add a second one.

I had originally bought the grate in hopes of using it, or possibly just to replace the existing one, which is missing the lever handle for the internal batten. Since I bought it, I've had it sitting at the foot of my computer "desk" (a temporary card table, which I'm sure made an appearance in the Office floor demo post a while back), and I thought it would work well there.

I started the work by cutting and installing some structural braces and floor supports that will carry the weight of the floor patch for the old vent hole (no photos yet). The floor patching/repair isn't done yet, but it will be soon.

The next day, I started to work on the actual vent location and construction. I think I cut the hole in the wall and the floor on "day 2" and did the rest yesterday (day 3), but regardless, let's jump into it.

Note: I don't really understand the logic with how the house was built, with regard to how they did the ventilation. The first floor's floor is made up of old barn wood boards laid diagonally across large "tree trunk" beams spaced every 3 feet. The barn wood is not all the same thickness, but most is around 1" to 1 1/8" thick, and the spacing is also uneven (many boards have raw edges). Over this, there's a layer of thin cardboard, and then the hardwood. That's it. But the odd part is when it comes to the ventilation. They just cut large holes anywhere they needed. What's odd about this, is that since the "sub floor" barn boards lay diagonally, once they're cut, they aren't supported by anything. The only thing that holds them in place are the nails from the hardwood over it. But they did this everywhere, and it was like this originally. All the original main-floor vents are 12x15 (with the exception of one 14x18 - which is the one I'm covering over in the office door), and they're all the same. In a few places, I added some supports, but for the most part (and a bit surprisingly), it's all very solid.

Step one was to find the best spot for the vent. I knew where I wanted it, but I didn't know exactly where the electrical wiring passed, since there's a light switch on this wall just above the vent location.

I drilled a bunch of 1" holes in the drywall, and felt around for the wire. I didn't see it. I then drilled a hole at the top of the vent hole, and also couldn't find the wire. I was pretty sure I wouldn't run into the wire, so I just went and cut the hole. The hole needed to start at a 2x4, and end up with solid on all 3 sides.



Those of you who visit frequently might recognize this as the "hallway wall" in the Office. For my vent, I was basing my measurements partially from my original vent/duct opening in the living room, and partially off the vent itself. I needed a hole about 11" high, and 12 1/2" wide. After the hole was cut, I could see that the electrical wire was about 4-5" higher than my hole, which was just perfect.

Next was cutting the bottom stud, and the floor. Kinda scary, but also kind of fun. If you're doing this in your home, make sure you have clearance below (you don't want to end up cutting your hole over a joist, though a pipe, or into a wire). In my case, my finished hole was going to land about 8-10" away from one of the log beams, and in a spot clear from wires and pipes.

In this next photo, you can see the old duct that was still in use, feeding the old floor grate to the left. It was going to be gone/moved to feed this new duct.



I'll also point out that you need the right tool to do this kind of work. This was done almost entirely with my Rockwell Multi-Tool (They call it the "SoniCrafter"). Best 130$ I've spent so far. I'm not getting paid to promote them, but it's a damned good product. The first experience with this type of tool I had, was through work (but we use a 600$ Fein version). I find the Rockwell to be as good as the Fein, which is surprising considering the price difference. We use it all the time on installations, to cut wood trim in odd places, for outlet holes in cabinets, drywall, etc. The blades can also be resharpened rather than simply replaced. New blades are about 15-20$, but a local company can sharpen them for around 8$, and then they are as good as new. I've cut through plywoods, hardwood (this birch floor is very hard), MDF, drywall, PVC, and all kinds of stuff, and they last quite a long time, but I'm getting side tracked.

Once I had my hole ready, I made a pattern for the duct work box. I am pretty sure that new ducts for these super OLD vents aren't available, and since I can make one for free, I went that route. I'm sure that there are many tinsmiths who make custom duct work, that can easily throw one of these together for you ($$$), but here's how I did mine.

For the most part it's just a simple box with a small slanted front. You need to make sure to make the box a tiny bit smaller than your opening (or it will NOT fit), and you also need to make sure it will stick-out low enough under the floor (to hook-up your duct work). Another consideration you need to take into account, is how you'll be hooking it into your HVAC system. Will the duct connect from the front, back, side, or bottom. What angle is best? Etc.

For mine, I wanted to try to have the final duct running near the log beam, in a straight line, so I wanted my duct hooked into the back. I have about 4 huge boxes full of scraps and duct fittings, and I found one that worked perfectly.

I decided to make a full sized paper template for this duct, because it was a complex shape.



The paper template proved to be very useful, since I had already goofed a piece on it. I actually had measured the bottom wrong. I made it 4 1/2" wide (the same size as the top), and it should have been 5 1/2" (this was easily fixed on the tin copy).





Since I was making this for free, I used only the available scraps of tin that I had laying around. The main sheet (a flattened-out 5" round duct) could only accommodate the central part of my duct box, so the two side pieces had to be made and attached separately.



Tools needed for this:

- Ruler
- Sharpie
- Framing Square (large)
- Awl, screw driver, or another tool to score the tin
- Tin snips or shears (basically these are metal-cutting scissors)
- GLOVES (strongly recommended but not required, though there's a very good chance you'll cut yourself)
- Wooden blocks with good square corners/edges (to use for bending the tin)
- Pop-rivets & rivet tool
- Drill (for rivet holes you need 1/8" bit)
- Hammer
- Foil duct tape

Optional: First Aid Kit (seriously, if you're not careful you can wind up with deep cuts) I didn't use gloves this time, and only ended up with two tiny scratches, but be careful. The edges will be razor sharp.

Start with drawing and measuring out your main shape. Be sure to leave tabs along the edges (1 inch is a good size), and also leave allowances to have a folded-over seam on the exposed finished edges (since these will be sticking out of the wall).

Cut out the shape, being careful not to crinkle or buckle the tin as you cut. Cut tapers on all the tab corners. Here you can see the front, bottom, back, and top of the box, with a fold-over seam at the front and top of the box (both ends of the sheet), and tabs along all the edges.



At this point, you can start by scoring, and folding-over the good edges, and then starting to bend your edge tabs (at 90 degrees). If you have an opening to do in the tin, cut it before you get too far.

Openings are always a total bitch to cut. Unless you have a special tool, you'll just have to be patient, and do your best. I started the opening, by poking a row of holes through the tin with the awl, and then sneaking-in my shears.





Pretty soon, your box will be starting to take shape.



To attach the sides, I used a combination of 6 rivets (hammered-down flat after installing them with the tool), and foil tape. If you prefer, you can use sheet metal screws, but since this is a vent box that I might want to reach-in and clean occasionally (or if something falls into it), I didn't want sharp metal screw tips in there.

I did use two screws, however, to attach the "factory" duct boot to my opening flaps, but I only used 2 screws.





The finished duct is held in place with flat roofing nails. I used 4 (one per side, one on top, and one into the floor at the front edge). I didn't take any photos of it, but a stud was added to the right side, and to the top around the inside of the opening. The drywall around the hole was secured with extra drywall screws.





From the basement, it looks pretty awesome now.



You'll note that I didn't add any floor supports (in reference to the "note" earlier), but I did nail the sub floor up into the wall studs on each side, and I added some screws from the bottom up into the hardwood, so it should be just fine.

You can see a lot of the repaired/improved ducts here. The large box over the stairs is the hallway's cold air vent, next to it, a vent to the "L Room", then the new duct for the new wall grate (you can see the new box in the top left), and the last duct is the other "L Room" vent.




Side note, this was the Office duct work "before":



And here's a "before" of the photo above. What a mess. I've actually gained a lot of head room with my repairs.

Friday, October 07, 2011

Ducts

I've been working on some more duct work. Namely the cold air return in the living room. What a total disaster that was (the previous job). I've got it sorted out, but now I'm left wondering if I have enough venting for the cold air return on my furnace. Basically, I have 13 hot air ducts (12 are 5" diameter, and one is 4"), and the only cold air return is from one 6" and one 5" duct. It seems to REALLY suck the air when the furnace is running, which makes me think that I might need another return. That's not a problem, though, since I CAN connect a second 5" duct right along side the current one (going upstairs) but I just don't know if I *SHOULD* or not. Heating systems are usually carefully calculated and balanced for every house, but I'm not entirely convinced that it was done properly in mine.

I want to get an expert in, to have a look, but the place I want to use isn't open on weekends. :(

Other than this, I haven't done much on the house lately (though the duct work job was quite messy and isn't done yet).

Wednesday, September 14, 2011

Roof Vent (Bathroom Vent)

Alright, I promised I'd be posting photos of the terrifying job of installing the vent on the roof, and here they are.

To start the job, I looked at a few on-line videos, and I quite like the ones by "Ask The Builder.com". In it, he shows an easy way to locate the best spot for the hole, which is to just put a nail into the roof from the interior. You can see the shingle that's raised-up by the nail in this photo. This is where the vent will go.

Photobucket

As I mentioned previously, the hardest part was the actual drilling of the hole. For further details on that, just go back to the previous entry. Once I had that done, my aluminum 4" duct was easy to install, using 3 small stainless steel screws.

Photobucket

Photobucket

The next step was to remove the nails that would be in the way of sliding the vent into place, and to trim the shingles. Now this is where I screwed up. I had my measurements with me, but I cut an inch off the top shingle, and I shouldn't have. If I had brought-up the vent with me on the roof I would have caught this mistake. In the end, I was able to just piece-back the 1 inch strip, and bury it in clear roofing cement (along with the underside, and edges and anywhere that would help against leaks).

Photobucket

Photobucket

You can see the goof here. The cement is clear, and it's laid-down pretty thick here (about 1/4 inch thick) over the edges of the vent.

Photobucket

Photobucket

Lastly, here is my homemade ledge. Very crude, but it did the trick.

Photobucket

Photobucket

Yay! All done.

Photobucket

Now that it's been a few days, I've had the chance to use the fan, but I think there might be a problem with the top flap/shutter. It seems like after a few minutes of running the fan it then suddenly sounds like it's being obstructed. This means I'll have to crawl back up there again. Ugh...

Also, while I was up in the attic, I decided to run the "spare" wire that used to feed the bathroom light into a permanent overhead attic light with a switch next to the attic door. The attic actually used to have a working light in it, but it was on the old knob and tube system, and it's not connected anymore (the socket is also missing from the fixture).

***

Another fun side note is that while cleaning the garage last week, I finally decided to get rid of the old vanity. My dad had suggested that I should keep it and use it for storage, but it's just so disgusting that I dragged it to the road. I did take a few "glamour shots" of it for you guys. LOL. I'll spare you and only post the ONE photo, but do take a moment to bask in its hideousness.

Photobucket

Friday, September 09, 2011

Shaky

As I sit here right now, I'm nervous, a bit shaky, and bathed in sweat. I decided that "today is the day" that I install the bathroom vent in the roof. I'm currently taking a short break.

A bit of background: I'm terrified of heights/falling, but since the portion of roof in question is only about a 6 foot drop to the garage roof, it's not such a big deal, but it still involves climbing ladders, and working on a roof with about a 45 degree pitch. The job itself is actually pretty simple, though. Drill a hole, fit a vent/pipe, then fit and install the cap. I could hire someone else to do this, but I'm too poor/cheap to do this, and I feel that if *I* do it, I know it will be done properly. Having just been up on the roof, I can see that some of the other vents/plumbing stacks were done a bit sloppily. I don't know if this is from the roofers who redid the roof in 2001, or if this was done badly in the first place (when the plumbing stack was switched to ABS.

So far, I'm about halfway there. I have all my ladders set up, and I had to install a temporary 2x4 ledge near the roof edge so that I can get on and off the ladder without falling (this is way trickier than it sounds). I made this at the last minute with just a 2x4, maybe 3 feet long, and 3 metal strips, screwed to the back. These strips are not the strongest, and are NOT made to be load bearing, but they're all I had on hand. They are the kind used to hold ducts in place. But I used three, and I'm being careful not to put too much weight on it. The other ends of each strip are held with a roofing nail *under* a shingle (so that the hole won't cause a leak later).

I'm taking a break after finishing the most difficult part of the job, which is to drill/cut the hole. I had intended to use a 4" hole saw, but the plywood really killed the battery on my drill, and I could see that it was going to take forever, so I switched to using my crappy jigsaw instead. I only needed to drill 2 pilot holes, then cut the remaining. At least with the hole saw, I had an accurate line that I could follow, but remember that getting the tools up there is quite tricky.

For the most part, I'm holding my essentials in a very large pocketed tool belt, but things like the saw (because of the incline) just slide down the roof. This is where that temporary ledge comes in handy.

Photos soon, of course.

If all goes well, my length of aluminum duct (to pass through the roof) will fit just snugly, I can screw it in, and then it'll just be a matter of trimming shingles, fitting the vent (which will also just want to constantly slide down the roof), nail, cement, etc. The rest of the connections can be done inside.