Alright, so far, so good. Several things are now varnished and DONE, but there's still a few things left to do, still.
First, the two built-ins are varnished, and have the shelf hardware installed. Second, the body of the bookcase is varnished, as are the backboards, which are installed, and the doors. What's left on the bookcase are the shelves (they have 1 coat so far), and I still need to make the knobs for the upper doors, a shelf for the upper case, and the top crest. The backboard (ply) is cut, but I want to paint it teal, and I need to decide on a shade.
I also need to pick up some glass for the upper doors.
Here are some photos (minus the upstairs built-in, which I forgot):
I had originally wanted to have the cherry stained a deeper red/mahogany colour, but it would have required a lot more work (stripping and sanding additional sections), and in the end, I'm quite happy with just the clear varnish.
The office built-in (same room). Same story here. I had thought about staining the Fir plywood a shade darker, but it came out perfect with just a clear varnish on it.
These next ones show the pieces in context within the room.
¡Felicidades JC, te ha quedado un mueble precioso sin aún estar terminado, estoy deseando verlo terminado con los cristales, baldas y tiradores adeciados, saludos Valentín
ReplyDeleteVery nice, indeed.
ReplyDelete